Selections Season: Choosing Tile, Cabinets and Fixtures in Summer for a Fall Build

Behind every remodel is a long list of decisions: cabinet style and finish, countertop material and edge, tile for the floor and backsplash, plumbing fixtures, lighting, hardware, paint colors and more. In the industry these are called selections, and the way they are handled has a big influence on whether a project runs smoothly. If you are planning a fall project, summer is the ideal time to make them.

Why decide in summer

Making selections before construction starts gives products time to arrive. Lead times vary widely, from in-stock items available right away to custom cabinetry and specialty tile that take much longer. Early decisions also let your contractor price the job accurately and plan the sequence of work.

Summer has practical advantages, too. Longer days leave more time for showroom visits after work. Strong natural light helps you see true colors in samples. And deciding at a relaxed pace beats choosing tile in a hurry while a crew waits.

Advertisement

The order that works

Some choices constrain others, so it helps to make them in a logical sequence.

  • Big-ticket items first: cabinets, appliances, windows and doors, since they drive dimensions and lead times.
  • Large surfaces next: countertops, flooring and tile, which set the room’s color and texture.
  • Fixtures and fittings: sinks, faucets, shower valves and trim, which must coordinate with each other and with the rough plumbing.
  • Lighting and hardware: fixtures, cabinet pulls and accessories.
  • Paint last, chosen to suit everything else rather than the other way around.

Appliances deserve special mention, because cabinet dimensions depend on them. Choosing them early avoids redesigning cabinets later.

Seeing samples together

A tile that looks perfect in a showroom can look different at home. Gather samples of the main materials, including a cabinet door, countertop, flooring and tile, and look at them together in the room where they will live. Check them in morning, afternoon and evening light, and under the kind of artificial lighting you plan to use. Large samples reveal far more than small chips, especially for materials with bold veining or pattern.

Keeping track of every choice

A selection sheet, whether a spreadsheet or a binder, keeps decisions organized. For each item, record:

  • Manufacturer, product name and model number.
  • Finish or color, size and quantity.
  • Where it goes in the project.
  • Who is ordering it and when it is expected.

Share the sheet with your contractor and keep it current. When a product is discontinued or delayed, the list makes finding an alternative much quicker. Many contracts include allowances for categories like tile and fixtures, and tracking selections against those categories helps you avoid surprises when the final invoice arrives.

Advertisement

Know when to stop

There are always more options to see, and endless browsing can stall a project. Set a target date to finalize selections, well before the planned start, and stick to it. Narrow each category to two or three finalists, decide and move on. A remodel built on firm decisions made in summer is far more likely to finish on schedule in fall.

A Selections Workflow, Week by Week

Spreading selections over several weeks keeps the process manageable. Here is one way to organize the summer, adjusting for your project.

  1. Week one: gather inspiration, review the design and make a list of every category you need to choose.
  2. Week two: choose appliances and confirm their dimensions. Share them with your designer or contractor so cabinet plans can be finalized.
  3. Week three: visit cabinet showrooms, choose door styles, finishes and interior accessories.
  4. Week four: choose countertops and flooring, bringing a cabinet door sample with you.
  5. Week five: choose tile for floors, walls and backsplashes, with countertop and cabinet samples in hand.
  6. Week six: choose plumbing fixtures, including sinks, faucets, shower valves and trim.
  7. Week seven: choose lighting, cabinet hardware and accessories.
  8. Week eight: finalize paint colors and review the full selection sheet with your contractor.

Some steps may take more or less time, and some can overlap. The point is to give each category its own attention rather than deciding everything in a rush.

Questions to Answer for Each Selection

  • Does it fit the design and dimensions?
  • Does it coordinate with the materials already chosen?
  • Is it available in the time needed, and what is the lead time?
  • How will it hold up to daily use, and how is it cleaned?
  • What warranty applies?
  • Does it require any special installation, rough-in or support?
  • Does it fit within the allowance or budget for its category?

Mistakes That Derail Selections

  • Choosing paint first. Paint comes in nearly endless colors, so matching paint to tile is far easier than the reverse.
  • Ignoring rough-in requirements. Some faucets, shower systems and lighting require specific rough-in parts or locations. Confirm these before construction.
  • Judging from a screen. Colors and textures look different on a monitor than in person.
  • Mixing too many finishes. Too many metals, woods and patterns can make a room feel busy. Decide on a palette and stick to it.
  • Forgetting about quantities. Order enough tile and flooring to cover cuts, waste and future repairs, and confirm all boxes come from the same production lot.
  • Waiting to order. A selection is not complete until it is ordered and confirmed.

What This Means for Your Budget

Selections often have more influence on the final cost of a project than any other decisions. A faucet, a tile or a light fixture can vary greatly in price within the same category. Making selections early lets your contractor price the job accurately and helps you see where the budget is going before construction begins. If the total is higher than expected, you can rebalance, perhaps choosing a simpler tile to afford the cabinets you want, without delaying construction.

Questions Homeowners Ask

What if something is discontinued after I choose it?

That is one reason to order early. If it happens, your selection sheet makes it easier to find a close alternative quickly.

Can my contractor make selections for me?

Many contractors and designers can recommend options, but you will live with the choices, so stay involved in the final decisions.

How many samples should I bring home?

Enough to compare real finalists, usually two or three per category. Bringing home a dozen tiles tends to reopen decisions instead of settling them. Return samples you have ruled out so they do not keep competing for attention.

Latest stories

View all
--:--·---·--°

Designed and Built by Fenway Web.

Our Network & Sponsors

Advertisement

Boston Made+Join Boston Made+$20/mo or $199/yr — save $41 when you pay annuallyJoin Now →Beacon Federal Partners

Advertisement

♫ Music Video Player
Press play — keeps playing while you browse